EN
FA پنجشنبه, 15 خرداد 1399
20 kV power supply from 63.20 kV substation of Shahid Fahmideh refinery and natural gas storage complex was put into operation in Sarajeh operational region.
The Director of Integrated Planning at the National Iranian Oil Company said the fate of all Iranian oil and gas joint fields had been determined except for one small field.
Last year,Iranian Central Oil Fields Company drilled and completed 9 new wells and 7 repair wells using eight drilling rigs.
The CEO of East Oil and Gas Production Company announced the production of 15 billion and 700 million cubic meters of gas in EOGPC in the past year.
Last year over 33% gas reproduction rise from Shorijeh D and Sarajeh Reservoirs was realized when compared to the same period of the previous year.
The idea of establishing oil startups was first raised less than a year ago by Petroleum Minister Bijan Zangeneh.
President
Leader
Shana
NIOC
Oil ministry
brochure
map
directorates
linkedin
rss